With a project like this it’s often easy to forget how much you’ve done, when the list of bits to do is so vast. Today felt like a significant milestone was hit though as the last outrigger and brake cable guide tube went in, completing the majority of the frame on which the floor sits:

There isn’t much in the below picture I’ve not replaced, but the result is worth it (5 floor supports, 2 cross members, 6 outriggers/jacking points, 2 inner sills, 2 brake cable guide tubes, numerous chassis repairs).

Now I just need to finish up a few minor welding bits, get some more paint on it and get the floor in!