A little more from this week.

The loom is now fixed in place through the front cross member (a real pain getting the welding torch into position doing this one, but looks ok!):

image
image

And onto the rear cross member, all clamped into place (I may’ve got carried away buying clamps as I’ve got a decent collection now):

image

And welded in (feel pretty comfortable with plug welds now):

image
image

Before I can get the Near side inner sill in there are a few bits of surrounding metal that need some attention (access would be tricky with the inner sill in):

image

Rot cut out, and inner sill clamped into place to give a reference point to work out where to bend the repair panel:

image

Repair panel made up in the vice (and checked against the replacement floor):

image

And all welded in (I’lll repair the bit in front of it at a later point, I’ll be able to do that bit with the sill in). Ignore the beautifully rotten middle sill in the last picture!:

image
image