Lots of jobs on the bug over the last two days.

Porsche 924 driveshafts all built up.

Gearbox and wheel arches given a few coats of clear underbody wax and gearbox all fitted (it’s a snug fit under there now!).

My plan for the next couple of weeks is to get the engine all built up. I’m not rebuilding this engine, more of a clean and tidy up. First up, heads off for some new pushrod tubes as the old ones are knackered.

Baja mountney steering wheel attached, bonnet straps riveted on and gearbox all cleaned up (or cleaned up enough for a Baja).

Next up is getting some underseal wax onto the wheel arches, the gearbox and the rear boot area for some added protection.

Brakes, steering and fuel tank all reinstalled in the Baja bug. Next up is the gearbox which needs a good cleanup before I can fit it.