Odds and sods this week as I’m finishing up the bits needed before I can get the floor panels in.

Front belly pan out of the rust treatment bath and it looks pretty solid. There are a few pin holes in it that I need to weld shut at some point, but I’ve put some zinc primer on it for now.

Finished up the chassis repair that was holding me back from getting the final 2 outriggers in. 

Epoxy mastic on the inside:

Welded shut:

And a coat of zinc primer on it.It looks miles better than what was there (note that it might look a bit short at the back, but its the other piece which is too large; you can see a nice patch straight over another rusty section. I’ll come back to do this). I’ve also epoxy mastic’d the chassis section where the outriggers will sit as I’ve done with the others. So I should be able to weld the outriggers in this week.

Made up a replacement tab for the clutch cable guide tube. The previous one had snapped off, and it was easier and better to make a new one (sorry about the blurriness!):

And finally I’ve got the RH floor pan trial fitted, and the in-fill piece to take it up to the side panel. 

Next week’s job; drill a ton of holes in the floor panel ready for plug welding to the floor supports and sills, and weld the in-fill piece onto it. I made a start just before I left today.