Getting the next batch of repair panels fettled to fit the baja. Front arch inners are done. I’ll get the rear quarters fettled too before painting the insides of them all with epoxy and then welding them in.
Trial fitted the front wings to check the bolt holes. Can’t wait to test fit the rest of the baja kit now!
N/S floor pan fettled to fit the chassis, and heater channels bolted on to check alignment. Pinned in place for now until I can check the fit against the shell.
Made an alignment tool for the pedal strengthening plate to make sure its installed in the correct place when I fit it to the new floor pan, and chopped out the O/S floor pan.
I finished chopping out the old N/S floor pan and prepping the surrounding metal for the new pan over the weekend.
The napoleons hat needs a new end grafting in but is otherwise rock solid:
The lip on the spine looks great and needs no repairs:
The rear support is also in good condition and just needs a bit more of a clean up:
Trial fitting the new floor pan. It still needs some further trimming along the front edge to get the back to fit flush.
I had to drill out two of the bolts for the drivers door hinge as someone had mashed the head of the bolt. The top mount will need replacing, and the bottom will be replaced as part of repairing the A pillar.