I finished the B pillar over the last couple of nights. Before I welded it in I wanted to check the fit of the front arch against it, so it needed to come off.
Cut:

Grind:

Done. The wheel tub is in ok condition so I’m just going to repair that when I get round to it.

The A pillar has seen better days though and will need some work when I get onto the front end:


With the outer B pillar clamped in place I tested the fit of the arch and outer sill, all looks good to me:

And all welded in. I just need to dress the plug welds at the bottom and it’s done:

Next up the C pillar on the N/S. Thus far I’ve chopped out the strengthening plate to get access to the back of the C pillar, I’ll fabricate a new strengthener tomorrow night and crack on with the rest of it: