Lots done this week. I’ve pretty much finished the cab area now. The arch step on the driver’s side has been reattached to the repaired floor:

And I’ve dressed all the welds and primed the driver’s cab floor repair. This is the first time I think I’ve seen the floor without it being riddled with rust and holes.


I also welded in the nuts needed for my new Buttys Bits throttle linkage and trial fitted it. It’s super smooth compared to the rusted mess that was there before.

I just need to weld in the closing panels that join the front arches to the deformation panel and everything in front of the B pillar is complete!