I’ve been burning the midnight oil over the last couple of nights getting the last few bits of the chassis complete as I really wanted to get it done this year so I could take two weeks off over christmas (the first time for probably 12 months).
I didn’t manage to get many pictures of all the bits I completed as I didn’t have time, so I did a short video as well.
N/S wheel tub repaired:
Remainder of the C pillar repaired including the strengthener, and then the panel joining the rear arch to the floor (I did the other side too). In addition to this I also welded shut the three holes that the Brazilian floors come with for heating (no pics).
And the finished result, it’s been a long slog but it’s been well worth it and I’m over the moon with what I’ve achieved. I’ll be on to the front end at the beginning of January as I have a week off to work on it.
And the rest of it: