I’ve made a big push this week to get the door frame on the O/S complete.
My repair piece for the door bottom tacked in:
And ground flush. It came out pretty well.
Style line curve closed up at last:
Repairs made to the bottom corner:
And more repairs to the seal channel:
Started stripping the bottom half to bare metal:
And a little while later, the bottom half all zinc primed.
Hoping to get everything prepped and epoxied over the next few days so I can get the skins on and have the doors done.